| Item | Description |
|---|---|
| Building’s interior | |
| Walls | Reinforced concrete exterior walls and inner load-bearing walls. Ceramic infill of the reinforced concrete construction Reinforced concrete monolithic ceilings - 22cm thick. Exterior walls insulated with 12 cm thick extruded foam, finished with structural silicate plaster colored to match the buildings’ facades |
| Partitions | H + H AAC (Aerated Autoclaved Concrete) Blocks |
| Walls and ceilings finishes i sufitów |
Gypsum plaster on the walls prepared from pre-mixed plaster compound. Tinted gypsum plaster on the ceilings |
| Floors | Cement screed floors prepared for installation of floor surface. Loggias (balconies) fitted with pressure treated wood. |
| Windows | Wooden frame windows, aluminum frame corner windows, fitted with air inlets2 multi-point locking fittings insulated glass of thermal conductivity k = 1,1. Powder coated aluminum exterior sills |
| Entrance doors | Steel reinforced, veneered fiberboard door panels. Steel frames. |
| Interior doors | Purchased and installed by the Buyers |
| Central Heating System | All apartments equipped with an integrated two function, sealed combustion chamber boiler, using double pipe connection to the exhaust duct. Low capacity steel baseboard radiators, fitted with thermostats |
| Cold and Hot Water and Sewage System | Low noise polypropylene pipes used in sewer mains Water supply points installed, with Aluplex pipes, with no plumbing fixtures and bathroom ware. |
| Exhaust ventilation system | Mechanical ventilation with galvanized steel ducts. |
| Cold and hot water meters |
Separate cold water meters installed for each apartment. |
| Electrical System |
Complete electrical system installed, except for lighting fixtures and eclectic stove oven. |
| Gas System | Separate gas meter installed for each apartment. Gas system connected to the two function boiler in each apartment . |
| TV system |
All apartments will be fitted with FFTH (fiber- to-the-home) optic fiber infrastructure by TP.SA (Polish Telecom). The optic fiber will work as the transmission medium and will be installed in each apartment. |
| Telephone system |
ISDN ready telephone system. One telephone socket in the living room. |
| Parking space in the multi-car underground parking garage | |
| Parking space in the multi-car underground |
Parking space marked permanently on the garage floor Magnetic card or a radio remote controller for controlling access to the underground garage. Unheated multi-car parking garage, equipped with all installations required by the Polish Construction Law The parking garage is CCTV-system ready. |
| Common spaces | |
| Entrance areas, corridors, lobbies, utility rooms and other common spaces |
1. Floor finishes: - cement screeds in garage corridors, garage staircases and utility rooms, - ceramic tile floors in basements, gres tiles on above ground corridors and staircases floors. 2. Wall finishes: - concrete finishes in garage walls, garage corridors, and utility rooms, - basement corridor walls coated with acrylic paints. - staircase walls and utility rooms walls coated with emulsion paints, - metal frame staircase railings with metal or wood panels 3. 6 person elevators with automated doors, underground parking garage accessible by elevators |
| Site planning and landscape design |
|
| Site planning and landscape design |
1. Concrete sett and stone paving on sidewalk surfaces, with wood elements. 2. Green areas design – small trees and shrubs - Green roof terraces over the underground parking garage. 3. Street and park furniture (benches, rockeries, playground, recreational complex), 4. Streetlamps and in-ground architectural lighting fittings, 5. The estate is CCTV-network ready. |
General contractor
ENERGOMONTAŻ-POŁUDNIE SA | Investor: CK MODUS Sp. z o.o. | References